Surveys for environmental assessment
Determination of improvement interventions.
Water sampling and chemical/physical analysis
Preparation of documentation required for:
Waste Water Discharge Authorization.
Environmental Impact Study
Project with 3D Solid Edge.
Technical Reports.
Prototype development.
Machinery industrialization.
AISI 304,316 Stainless steel, hot-dip galvanized machining and welding.
Metal carpentry works.
Iron working and welding.
Installation of electro-mechanical equipment.
Assembly of systems for wine production.
Assembly of purification plants.
Hydraulic connections.
Electrical connections.
Service and repairs
Maintenance and modifying for existing facilities.
Upgrade of sewage treatment plants.
Periodic inspection visits.
Technical-operational management of purification and potabilization plants.
Installation of equipment for continuous water quality analysis.
Installation of remote control systems.